Bottom Creek Brewery & Restaurant-Bid Pack #2-All Building Trades-North Branch, MI

From: Gleeson Constructors(Co-op)
E23-225

Basic Details

started - 15 Apr, 2024 (19 days ago)

Start Date

15 Apr, 2024 (19 days ago)
due - 14 May, 2024 (in 9 days)

Due Date

14 May, 2024 (in 9 days)
Bid Notification

Type

Bid Notification
E23-225

Identifier

E23-225
Gleeson Constructors, Inc

Customer / Agency

Gleeson Constructors, Inc
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

C.E. GLEESON IS THE AWARDED CONSTRUCTION MANAGER FOR THIS PROJECT Send bid proposal on company letterhead, and any CEGC provided “Scopes of Work” documents to estimating@gleesonconstructors.com CC:trostle@gleesonconstructors.com.*** Please be certain to return any CEGC scopes of work with your proposals to ensure apples-to-apples bid comparisons. Bid Package #2 includes the associated underground scopes of work within the building pad; and all other related scopes of work required to construct the (3) structures on site.Buildings only Construction of a New Resort Area, Including a Restaurant, Brewery, and PavilionDivision 4 Masonry: Exterior Stone Cladding and MortarDivision 5 Metals: Structural Steel, Steel Joists, Decking, Guardrails, Metal Pan Stairs, Railings, Decorative Metals Division 6 Wood Plastics: Wood Framing, SIP roof panels, Heavy
Timber Construction, 2x6 and 2x8 T&G decking, LVL, TrussesDivision 6 Wood and Plastics: Millwork Install, Architectural Woodwork (Countertops), Wood Base, FRPDivision 7 Thermal and Moisture Protection: Damp proofing, Roof & Decking Insulation, Above Ground Vapor Retarders, Metal Roof Panels, Metal Wall Panels, Wood Siding, TPO Roofing, Flashing, Gutters & Downspouts, Firestopping, and Joint SealantsDivision 8 Doors and Windows: HM Doors and Frames, Aluminum Doors, Wood Doors, Access Doors and Frames, Overhead Coiling Doors, Sectional Doors, Aluminum Entrances and Storefronts, Door Hardware, Louvers, Glazing Surface FilmsDivision 9 Finishes: Gypsum Board, Cement Board, Gypsum Board Assemblies, Ceramic Tile, Acoustical Panel Ceilings, Resilient Floor Tile, Slip Resistant Flooring Treatment, Concrete Floor Staining, Wallcoverings, Epoxy Flooring, Interior Staining, Interior Steel Coatings, Carpet, PaintingDivision 10 Specialties: Wall and Door Protection, Toilet and Bath Accessories, Fire ExtinguishersDivision 12 Furnishings: Custom Casework, wall panels, and trimsDivision 21 Fire Suppression: Fire Suppression Sprinkler SystemsDivision 22 Plumbing: Under slab scopes of work, tie-ins to the site services, General Plumbing Requirements, Plumbing Fixtures, Piping, Pipe InsulationDivision 22 HVAC: General HVAC RequirementsDivision 26 Electrical: Secondary scopes of work from the Owner provided Transformers, MDP, and meter bases, Under slab scopes of work, tie-ins to the site services, General Electrical Requirements, and Lighting.Division 31 Earthwork: As it pertains to the building construction only: ref the BP#1 Foundations narrative for the limited details in this scope of work. All other site work is By OwnerDivision 32 Exterior Improvements: By Owner Number E23-225 Title Bottom Creek Brewery & Restaurant-Bid Pack #2-All Building Trades-North Branch, MI Available Date 4/15/2024 2:00 PM Due Date 5/14/2024 12:00 PM Contact Information Bid Type Default Bid Type

984 Livernois Rd, Troy, MI 48083, USALocation

Address: 984 Livernois Rd, Troy, MI 48083, USA

Country : United StatesState : Michigan

You may also like

Library Square Buildout - Units 8 Through 9a - Brewery

Due: 13 May, 2024 (in 8 days)Agency: City of Sunrise

Library Square Buildout - Units 8 Through 9a - Brewery

Due: 13 May, 2024 (in 8 days)Agency: City of Sunrise