Added:Jan 27, 2019 6:53 amRFI 201901CABLE PULLS, LINAC, UB, TRANSFER LINE1.0 Purpose:The purpose of this Sources Sought Notice is to perform market research to determine:Industrial capabilityIndustrial experienceSubcontractor's Estimated Cost - Rough Order of Magnitude (ROM)Subcontractor's Estimated ScheduleSubcontractor's Risk Assessment2.0 Background:Fermi Research Alliance, LLC (FRA) is under contract by the Department of Energy to upgrade its existing accelerator complex, at Fermilab, Batavia Illinois.The project called the Proton Improvement Plan-II (PIP-II) is an improvement program for a high-intensity proton facility with goal focused to achieve beam power in excess of 1 megawatt (MW) on target at the initiation of Long Baseline Neutrino Facility (LBNF) operations. PIP-II requires equipment and facilities upgrades to achieve multi-MW proton beam capabilities at Fermilab.3.0 Documents:RFI 201901 121.04.05.05.02 Cable Pull Linac UB Transfer LineRough Order of Magnitude ROM Spreadsheet4.0 Instructions4.1 Fill in Spreadsheet (ROM, Schedule, Company Name, business size status, DUNS number, primary NAICS Code)4.2 Describe Similar Experience.Microsoft Word Format (preferred)4.3 Discuss Equipment, Personnel, and Facilities4..4 Describe risks5.0 Questions:At this time Fermi Research Alliance LLC will not be able to respond to questions concerning this
Location
Place Of Performance : N/A
Country : United States
Classification
221 -- Utilities/221122 -- Electric Power Distribution