be considered. In addition, as part of the Feasibility Study for West Elementary School, the District would like to examine an option to add a Pre-Kindergarten program to the school. The design to be evaluated will include the following grade configuration and enrollment: West Elementary Grades K-5 as currently configured: 925 students (plus the potential for Pre-Kindergarten students).
Notice to Proceed with Designer services is anticipated in September of 2019. The combined duration for the Feasibility Study and Schematic Design phases is scheduled for 10-14 months.
The estimated construction budget for a potential Project may range from $65,000,000 to $95,000,000, depending upon the solution that is agreed upon by the Owner and the MSBA.
A Statement of Interest for the West Elementary School has been submitted to the MSBA and will be provided as an attachment to the RFS.
Specific professional qualifications required of applicants for the design contract are listed in the RFS. Categories of work for which the Designer will be required to list subconsultants are also listed in the RFS.
A non-mandatory briefing session for potential applicants will be held at the West Elementary School located at 58 Beacon Street, Andover, MA 01810 at 10:00 AM on Thursday, June 20, 2019. The tour will continue at Bancroft Elementary School at 15 Bancroft Road, Andover, MA 01810. No unauthorized visits to the West Elementary School are permitted.
The Fee for Basic Services will be negotiated.
The RFS may be obtained from the Owner’s Project Manager on or after Wednesday, June 5, 2019. All questions regarding the RFS shall be directed to the Owner’s Project Manager via mail or email. Deadline for questions is Monday, June 24, 2019 at 5:00 PM.
Owner’s Project Manager
PMA Consultants, LLC
35 Braintree Hill Office Park
Suite 300
Braintree, MA 02184
Attention: Brian DeFilippis,
WestES@pmaconsultants.comCompleted applications are due on or before 12:00 PM on Tuesday, July 2, 2019 and shall be submitted to:
PMA Consultants, LLC
35 Braintree Hill Office Park
Suite 300
Braintree, MA 02184
Attention: Brian DeFilippis
Publication Date/Time:
6/5/2019 8:00 AM
Closing Date/Time:
7/2/2019 12:00 PM
Pre-bid Meeting:
06/20/2019 10 AM
Related Documents:
View Document(s)