From: Federal Government(Federal)
Basic Details | Start Date17 Nov, 2023 (5 months ago)Due Date17 Aug, 2025 (in 15 months)Identifier69056723B000019 |
Customer / Agency | |
SetAside | SBA(Total Small Business Set-Aside (FAR 19.5)) |
Attachments (1) | |
OR FLAP DOT CRGNSA 100(8), Multnomah Falls Viaducts RepairsColumbia River Gorge National Scenic AreaMultnomah County, OregonLOCATION: 17 miles E of Troutdale, ORWORK: The project includes repair of two historic concrete viaduct structures located on either side of Multnomah Falls Lodge. Repair work includes concrete patching, crack injection, rebar repair, cathodic protection, polymer concrete deck overlay, beam shear strengthening, wall repair, and surface coating. One viaduct is approximately 403-feet long and one is 864-feet long. See “Project Description” posted in Attachments for additional details.LENGTH: 2.6 milesTENTATIVE COMPLETION DATE: Spring 2026CONTRACT TYPE: Sealed BidESTIMATED PRICE RANGE: $5 million to $7 million. INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE.To ensure you receive notification when the solicitation documents are posted, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this