Classroom & Conference Room Technology Services, College Wide

expired opportunity(Expired)
From: Valencia College(Higher Education)
RFP 2019-22

Basic Details

started - 21 Feb, 2019 (about 5 years ago)

Start Date

21 Feb, 2019 (about 5 years ago)
due - 25 Mar, 2019 (about 5 years ago)

Due Date

25 Mar, 2019 (about 5 years ago)
Bid Notification

Type

Bid Notification
RFP 2019-22

Identifier

RFP 2019-22
Valencia College

Customer / Agency

Valencia College
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Status : Canceled

Fiscal Year : 2019
Primary Contact : César Colón
Secondary Contact : Valencia Procurement
Title : Classroom & Conference Room Technology Services, College Wide
Number : RFP 2019-22
Type : Request for Proposal
Online RFQuote : Yes
Department :

Notes : APPENDIX A SCOPE OF WORK AND TECHNICAL REQUIREMENTS Qualified suppliers are invited to submit their proposals to take part, with Valencia College for the purchase, installation, and support of all system components for Smart Classrooms as described herein. The College is looking for a turnkey operation complete with all materials, labor, programming, and related services. 1.1 Mandatory Requirements The Smart Classroom system components may be installed on any of the campuses of Valencia College. The selected supplier must be able to provide the following: 1.1.1 The selected supplier must have the capability to store all equipment until the time for the installation.
Valencia College does not have the resources to store, handle and ship the equipment until time for the installation. 1.1.2 The selected supplier must be capable of providing local service and support of the equipment and services provided. The selected supplier must be able to provide same day service and in compliance with any agreed upon Service Level Agreements. The selected supplier must have the means to provide technical phone support. The selected supplier must provide status to campus point of contact prior, during, and after each service and support incident. 1.1.3 The selected supplier must have inventory turnaround capabilities for direct replacement of major components as defined in EXHIBIT A for warranty repair in accordance with Service Level Agreement. 1.1.4 The selected supplier must provide one year warranty on parts and labor used during installation and provide required documentation. 1.1.5 The selected supplier must perform in house repair and warranty service for all major manufacturers for the equipment installed in the classrooms. 1.1.6 The selected supplier shall not “outsource” the installation services. Consistency must be maintained in the installation of each classroom, therefore the same installation practices must be adhered to during each installation. 1.1.7 The selected supplier must prove that they have the available full time staff to meet the installation requirements. At any given time, Valencia College may request several rooms to be installed simultaneously on different campuses. 1.1.8 The selected supplier must have a resident full time certified programmer on staff to support any programming needs for the classroom technology as outlined in the document. 1.1.9 The selected supplier shall have the flexibility to perform the installation in stages (i.e., pull cable when the room is ready, then return for the final installation, and return for a follow up service trip after the room is completed to resolve any issues.) 1.1.10 Prior to the start of any project the selected supplier shall be available to complete a walk-through of each room to document project requirements in coordination with Valencia constituents. 1.1.11 At the completion of each room the sales engineer, systems integrator and Valencia personnel shall inspect and completely test the equipment before the Valencia project manager certifies the functionality of the equipment. 1.1.12 The selected supplier must be able to respond and resolve in accordance with the established Service Level Agreement giving priority to address emergency issues. 1.1.13 Time and travel costs incurred to/from or other travel is the responsibility of the provider. 1.2 Equipment Requirements 1.2.1 The Smart Classrooms will have standard equipment in all the rooms, with the flexibility to add or delete equipment based on the faculty’s needs for that department. The equipment in the Valencia Technology Enabled Classrooms shall include the following current industry standard components (see Attachment J: Preferred Equipment) Wall or ceiling mounted projector Projection surface Physical Media Player (i.e. Blu-ray) Desktop Interactive Document Camera Loudspeakers in accordance with learning space requirements Wireless Display Support Touch control panel and related equipment Equipment cabinet or desk PC computer w/display, wired keyboard and mouse (provided by Valencia) Wireless keyboard and mouse Cable cubby within desk (electric, VGA w/audio cable, HDMI cable, network cable) IP Phone (provided by Valencia) Zoned lighting (instructor’s area and student’s area) (provided by Valencia) 1.2.2 All equipment furniture shall be keyed alike. The equipment housed in the cabinet may include, but not limited to: • Physical media player • PC computer (supplied by Valencia) • Drawer for storage space (i.e. remote controls, AV adapter, interactive pens, documentation, etc.) • Control systems Space for auxiliary/additional equipment (4RU minimum) The equipment cabinet (see Attachment J: Preferred Equipment List/Cost) shall be a minimum 18 Rack Units in height. For the equipment that will be used by the faculty (i.e. Blue-Ray player and PC computer) this equipment shall be installed in the top of the cabinet for easy accessibility, with the drawer immediately below this equipment. The rack component layout must be approved by Valencia before final assembly of the cabinet is completed. All equipment shall be rack mounted in the cabinet with a minimum of one mounting screw being a theft deterrent screw. Proper ventilation shall be provided as needed. 1.3 System Requirements 1.3.1 The room shall have a wall or ceiling mounted projector. The room shall include audio sound system speakers. Current standard configuration is described in EXHIBIT A 1.3.2 The control system for the room shall be a digital control system. The touch panel must be able to control all of the equipment in the room. The touch panel will include a volume control that will show a percentage level of the volume. The main/source page layout shall include the video image in the upper right-hand corner and shall go to the full screen by touching the image window. The main/source page shall return by touching the panel when the full image is shown. The main/source page shall have all the video source and computer selection buttons, system control, volume buttons, and lights button, if applicable. 1.3.3 The digital processor shall include the necessary hardware and software to support the system. Valencia shall supply the required data ports to connect the processor to the network. The connection shall be located near the equipment cabinet. 1.3.4 Each classroom shall have access to source code of all pages from the control system, in order to operate the classrooms from a remote location. The program shall include data gathering and room monitoring modules. Valencia shall provide the static IP address. 1.3.5 The equipment programming requirements shall be reviewed and discussed between Valencia’s OIT appointed representative and the supplier’s certified programmer. Valencia will take ownership of all programming for the system upon completion of each classroom. The files and source code shall be provided. 1.3.6 Cabling shall be provided to support any related technology. 1.3.7 All the equipment shall be mounted using tamper proof hardware. Valencia shall provide the security hardware and software for the non-secured components. 1.3.8 A preliminary review of the system and component layout with equipment will be submitted to Valencia for review before the initial installation will begin. 1.3.9 Complete wiring diagrams and component layouts are required in electronic form and hard copy. All equipment operation manuals, equipment model number, serial number shall be submitted for each room. 1.3.10 All documentation shall be submitted to Valencia’s OIT appointed representative after the completion of each room per Valencia’s guidelines. 2. WORK TO BE PERFORMED BY VALENCIA 2.1 Electrical All electrical wiring (i.e. lighting, 120VAC duplex outlets) will be provided by Valencia before the equipment installation will begin. There will be one (1) 120VAC duplex outlet located on the wall in the area specified within the cut sheet for projector along with one (1) single gang box for AV cabling. One (1) 120VAC quadplex outlet shall be located near the equipment cabinet. The supplier shall supply power requirements and cut sheets for the equipment being installed. Valencia shall make all electrical connections 120VAC or greater. Supplier shall be responsible for all “low voltage” connections. Valencia shall provide one (1) double ganged box with two (2) 1” conduit run above the ceiling grid for AV cabling between the equipment cabinet, the wall components, and instructor’s desk, to be located near the equipment cabinet. All cabling shall be Plenum rated. 2.2 Lighting Valencia may provide zoned lighting in the classrooms. There will be two possible lighting schemes. All lights will be connected to wall switches. All lighting will be controlled by the control system. Provisions will be made to allow connection of the lighting interface unit into the lighting system. The lighting interface unit shall be located above the ceiling grid above the main entrance into the room. The lighting scheme will be determined before the renovation of the room begins. 2.3 Physical Valencia shall provide a professionally installed dry erase/projection surface which will allow for a typical projection area size of 100” diagonal. 2.4 Networking Valencia shall provide each classroom with a minimum four network drops. The four drops shall be located near the equipment cabinet and will be used for: PC computer Laptop System processor Spare Valencia shall provide one (1) double ganged box with one (1) 1” conduit run above the ceiling grid for data cabling. All cabling shall be Plenum rated.
Piggyback Solicitation : No
Insurance Required : No
Bid Bond Required : No
Bid Bond Amount :

Broadcast Date : 2/21/2019 7:00 PM
Question End Date : 3/7/2019 10:00 AM
Due Date : 3/25/2019 2:00 PM
Bid Opening Date :
Anticipated Award Date : 5/15/2019

Valencia College, P.O. BOX 3028, Orlando, Florida 32802Location

Address: Valencia College, P.O. BOX 3028, Orlando, Florida 32802

Country : United StatesState : Florida

You may also like

CONFERENCE ROOM AV UPGRADE

Due: 28 Feb, 2027 (in about 2 years)Agency: VETERANS AFFAIRS, DEPARTMENT OF

AV IDIQ - BUILDING 1247 NORTH CONFERENCE ROOM AV UPGRADE

Due: 30 Sep, 2025 (in 18 months)Agency: DEPT OF DEFENSE

CONFERENCE AND TRAINING ROOM UPGRADES

Due: 14 Sep, 2024 (in 5 months)Agency: ATF ACQUISITION AND PROPERTY MGMT DIV