CMR for DMV Camp Hubbard Renewal Solicitation ID: 0001002 Status: Addendum Posted Contact Name: James Gonzalez Contact Number: 512-936-0647 Contact Email:
james.gonzalez@tfc.texas.gov Response Due Time: 3:00 PM Agency/Texas SmartBuy Member Number: 303 Days Solicited: 21+ Days for Solicitation Notice Solicitation Posting Date: 3/28/2024 Response Due Date: 4/30/2024 Last Modified: 4/4/2024 9:15 am Solicitation Description: The Texas Facilities Commission (TFC) is requesting qualifications for a Construction Manager-at-Risk (CMR) to provide construction, demolition, and renovation services for the Texas Department of Motor Vehicles Camp Hubbard Renewal Construction, b) The Project includes phased construction of a new 141,634 square foot office building, with warehouse and central utility plant, renovation of an existing office building, integration of the new office building with the renovated office building, demolition
of four existing buildings, partial demolition of the existing central utility plant, and site amenities including courtyards, landscaping, and surface parking.Phase 1 of the Project includes renovations to building CH6 to provide a new data center and a swing space for temporary relocation of personnel currently officing in CH5. Phase 2 includes demolition of buildings CH2, CH3 and CH5 to provide the construction site for the new building. Phase 3 includes construction of the new office building, warehouse, and central utility plant. Phase 4 includes demolition of building CH1, and partial interior demolition of buildings CH6 and CH7. Phase 5 includes the remaining sitework construction. All phases are included in this solicitation. Provide prime Construction Manager at Risk services for the construction, demolition, and renovation phases of the Project for the Texas Department of Motor Vehicles Camp Hubbard Campus. Services shall include but are not limited to Preconstruction services, plan reviews, constructability reviews, developing and managing construction cost estimates, developing and managing complex critical path schedules, and developing, bidding, and managing multiple packages for construction, as necessary, to complete the scope of the Project. URL: Addendum: Class/Item Code(s): 90922-Building Construction, Non-Residential (Office Bldg., Etc.) 90924-Building Construction, Commercial And Institutional 90930-Building Construction (Not Otherwise Classified) 90961-Maintenance And Repair, Non-Residential Building 90963-Maintenance And Repair, Commercial And Institutional Building 91240-Demolition Services 90925-Building Construction, Prefabricated (All Types) 90976-Site Work 90977-Special Construction: Observatory, Security, Special Rooms, Etc. 91115-C.I.P., Construction and Rehabilitation, Other than Buildings 91116-C.I.P., Construction and Rehabilitation, Buildings 91427-Carpentry 91430-Concrete 91438-Electrical 91444-Flooring 91447-Glass And Glazing 91450-Heating, Ventilating And Air Conditioning (Hvac) 91453-Insulation 91457-Metal Work 91461-Painting And Wallpapering 91468-Plumbing Attachments#NameDescription1ESBD_File_353970_RFQ #0001002 CMR for DMV Camp Hubbard Renewal FINAL.pdfRFQ Solicitation document2ESBD_File_353970_0001002 Attachment D - HUB Compliance Reporting System - Online Process Guide.pdfAttachment D- HUB Compliance Reporting System - Online Process Guide3ESBD_File_353970_0001002 Attachment G - CMR Contract Template - signed.pdfAttachment G - CMR Contract Template4ESBD_File_353970_303-4-0001002 Addendum #1 FINAL.pdfAddendum #1 to RFQ #0001002