Rebuild of Jackson Davis Elementary School

From: Henrico(County)
24-2670-4JOK

Basic Details

started - 19 Apr, 2024 (15 days ago)

Start Date

19 Apr, 2024 (15 days ago)
due - 28 May, 2024 (in 23 days)

Due Date

28 May, 2024 (in 23 days)
Bid Notification

Type

Bid Notification
24-2670-4JOK

Identifier

24-2670-4JOK
Henrico County

Customer / Agency

Henrico County
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The Work consists of construction of a new elementary school replacing an aging, campus-style schools on the same site. This school is a same-site replacement and construction will occur while students occupy their existing buildings. It is not anticipated that portable classroom units will be required for the Work. Upon completion of the new school, demolition of the existing facilities will occur to facilitate final site work. The new building will be a two-story building. The main use of the building will be education and assembly. Construction will be type I-B, fully sprinklered with a non-separated mixed occupancy. The primary structural frame will use masonry bearing walls where available but will consist mainly of steel post and beam construction. The building will be 34’-0” tall. Inside, classrooms will feature one toilet room per class, with lavatories installed within each classroom, directly outside of the toilet room. Larger public-use toilets will be available on the
public corridor. Interior finishes will consist generally of brick, block, and painted drywall. Glazed wall tile will be used for wet locations. Ceilings will primarily feature lay-in type acoustical ceiling panels to create a favorable acoustical environment. Where tall ceilings or public spaces exist, wood or other decorative ceilings may also be used. Exterior materials will consist of brick, metal panel, metal composite panel (MCM), terra cotta, and similar material. Glazing will be insulated glazing units set in thermally broken aluminum storefront or curtain wall material. Spandrel panels or metal panels within the storefront or curtainwall systems will be insulated. The roof will consist of black EPDM and will be designed to hold solar photovoltaic panels. The schools will have an elementary-sized gym with a high roof to allow for sports and physical education. Joining the gym and the cafeteria will be a performance platform that will be able to open from either end, creating a flexible performance space. Per Henrico County standards, it is expected that this project will achieve a minimum LEED rating of Silver. The project is located at 8801 Nesslewood Drive, Richmond, VA 23229. Number 24-2670-4JOK Title Rebuild of Jackson Davis Elementary School Available Date 4/19/2024 12:45 PM Clarification Deadline 5/20/2024 11:59 PM Due Date 5/28/2024 2:00 PM Contact Information Oscar Knott, Purchasing Director kno008@henrico.us Bid Type ITB

8600 Staples Mill Rd, Richmond, VA 23228, United StatesLocation

Address: 8600 Staples Mill Rd, Richmond, VA 23228, United States

Country : United StatesState : Virginia

You may also like

Yerington Elementary School Kiss and Drop Project

Due: 14 May, 2024 (in 9 days)Agency: DOWL, LLC

Rebuild of Jackson Davis Elementary School

Due: 28 May, 2024 (in 23 days)Agency: Henrico County

RFT Hess Street Elementary School Renovation

Due: 08 May, 2024 (in 3 days)Agency: Hamilton-Wentworth District School

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.