Search results for: marin streets wet

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 439,169
Looking for opportunities in Marin County, California, United States?
  • Kansas and Marin Streets Wet Weather Conveyance Tunnel

    Type : Bid Notification

    Due : 21 Sep, 2021 (about 2 years ago)
    Posted : about 5 years ago
    Started : 22 Jul, 2021 (about 2 years ago)

    The proposed auxiliary sewer would allow wet weather flows to enter the Contract C Box earlier, thereby, lowering the hydraulic grade line (HGL) of the Marin Street sewer. Based on the findings and results of the hydraulic analysis performed, the elements described below would meet the proposed project needs.

    From: San Francisco Public Utilities Commission (Utilities)

  • TROUSERS, <b>WET</b> WEATHE

    TROUSERS, WET WEATHE

    Type : Bid Notification

    Due : 02 May, 2024 (Today)
    Posted : 9 days ago
    Started : 22 Apr, 2024 (9 days ago)

    OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 6 OF 23 PAGES SPE1C1-24-T-1876 SECTION B PR: 7007278000 NSN/MATERIAL:8405015289970 ITEM DESCRIPTION TROUSERS,WET WEATHE TROUSERS, BIB, WET WEATHER RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND

    From: Federal Government (Federal)

  • Kansas and Marin Streets Wet Weather Conveyance Tunnel Cost: $12,500,000 to $16,000,000

    Type : Bid Notification

    Due : 21 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 22 Jul, 2021 (about 2 years ago)

    The proposed auxiliary sewer would allow wet weather flows to enter the Contract C Box earlier, thereby, lowering the hydraulic grade line (HGL) of the Marin Street sewer. Based on the findings and results of the hydraulic analysis performed, the elements described below would meet the proposed project needs.

    From: Berks County (County)

  • Stateline Avenue Complete Streets Project

    Type : Bid Notification

    Due : 03 May, 2024 (Tomorrow)
    Posted : 27 days ago
    Started : 04 Apr, 2024 (27 days ago)

    The work shall include all tasks associated with conceptual planning and engineering to develop a preferred alternative for the circulation study zone and complete streets layout for Stateline Avenue from Hwy 50 to Lakeshore Blvd.

    From: City of South Lake Tahoe (City)

  • Millbrook Wastewater Treatment Plant Wet Well Upgrades

    Type : Bid Notification

    Due : 08 May, 2024 (in 6 days)
    Posted : 6 days ago
    Started : 24 Apr, 2024 (7 days ago)

    Millbrook Wastewater Treatment Plant Wet Well Upgrades Project Description :This RFT is being called for the installation of five (5) new flow metering devices, and the installation of four (4) submersible Flygt pumps within the Millbrook Wastewater Treatment Plant’s Headworks at 25 Centennial Lane in the Village of Millbrook. In the Wet Well there are four (4) existing... See more Contact Information :-Wayne Hancock 705-932-9327

    From: MerX (Federal)

  • SE 4 Wet Well Relocation & Directional Drilled Force Main Installation

    Type : Bid Notification

    Due : 06 May, 2024 (in 4 days)
    Posted : 14 days ago
    Started : 17 Apr, 2024 (14 days ago)

    Bid Number:DPW 24-023-B Bid Title:SE 4 Wet Well Relocation & Directional Drilled Force Main Installation Category:Public WorksStatus:Open Description: The Town of Amherst invites sealed bids for the South East #4 Wet Well Relocation & Directional Drilled Force Main Installation located on Southeast Street, Amherst, MA 01002.

    From: Amherst (Town)

  • CERC A3 Wet Lab Electrical Reel Installation

    Type : Bid Notification

    Due : 15 May, 2024 (in 13 days)
    Posted : 5 days ago
    Started : 26 Apr, 2024 (5 days ago)

    CERC A3 Wet Lab Electrical Reel InstallationThe USGS Columbia Environmental Research Center (CERC) has a requirement requires installation of 15- 120v electrical reels, 7- 120v receptacles, and 4- 220v receptacles in the wet lab area of the A3 Admin building. The project must be completed within 30 days of the notice to proceed.

    From: Federal Government (Federal)