Search results for: flood warning

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 5 of 5
  • Flood Warning System Maintenance and Consulting Services

    Type : Bid Notification

    Due : 24 Apr, 2024 (3 days ago)
    Posted : 1 month ago
    Started : 26 Mar, 2024 (1 month ago)

    EARLY WARNING SYSTEM, ENGINE POWERED, TRAILER MOUNTED 57837 - FLOOD CONTROL DEVICES, EQUIPMENT, ACCESSORIES & PARTS 91595 - WARNING SYSTEM SERVICES, CITIZEN 91881 - NATURAL DISASTERS (FIRE, FLOOD, WIND, QUAKES) CONSULTING 93627 - EMERGENCY WARNING SYSTEMS MAINTENANCE CIVIL DEFENSE/DISASTER 98826 - FLOOD CONTROL SERVICES License Requirements Department Office of Procurement and Contract Admin Address 6751 Columbia Gateway Drive Suite 226 Columbia,

    From: Howard County (County)

  • NovaStar Cloud Migration

    Type : Bid Notification

    Due : 08 May, 2024 (in 11 days)
    Posted : 1 day ago
    Started : 25 Apr, 2024 (2 days ago)

    Current Configuration: The FCDMC Flood Warning System (FWS) currently uses a primary database node (NovaStar5a, master server), a secondary node (NovaStar5b, backup server), and a third node (NovaStar5d, slave server) to store approximately one million data points per month. These three physical servers are internal to the FCDMC network and are currently running Debian Stretch.

    From: Maricopa (City)

  • Bull Creek Old Lampasas #3 Dam Modernization

    Type : Bid Notification

    Due : 26 Apr, 2024 (1 day ago)
    Posted : 11 days ago
    Started : 11 Apr, 2024 (16 days ago)

    Type:Invitation For Bids (IFB) Status: Open Solicitation Number:IFB 6100 CLMC1040 Description:Bull Creek Old Lampasas #3 Dam Modernization Summary:The Work consists of grading and resurfacing the upstream and downstream embankment slopes of the dam, replace the existing principal spillway with a new 42” diameter reinforced concrete pipe and cradle, installation of a new intake structure and low flow riser upstream, raise the top of dam & auxiliary spillway elevation to meet City and state safety criteria, install a new auxiliary spillway, install new concrete headwall for the principal spillway & downstream armoring of the existing outlet channel, install a new permanent drive to allow for maintenance, and install a Flood Early Wa...

    From: Austin (City)