Type : Bid Notification
PAINT ALL HANDRAILS, STEEL FOR STAIRS AND EXISTING BLUE COLUMNS ACCENT 1. 9 PAINT ACCENT WALL WHERE INDICATED ON PLAN, SEE PHOTOGRAPH 4. OTHER 3 WALLS: PAINT TOP BLOCK ACCENT 4; PAINT NEXT TWO BLOCKS ACCENT 1.
PAINT ALL HANDRAILS, STEEL FOR STAIRS AND EXISTING BLUE COLUMNS ACCENT 1. 9 PAINT ACCENT WALL WHERE INDICATED ON PLAN, SEE PHOTOGRAPH 4. OTHER 3 WALLS: PAINT TOP BLOCK ACCENT 4; PAINT NEXT TWO BLOCKS ACCENT 1.
You will find the stairs and elevator to The Conference Center directly behind the international ticket counters to the mezzanine level. Our reception area is at the top of the stairs, through the double glass doors on your left. Attendees must bring/wear their own OSHA-compliant helmet and safety glasses, reflective vest, long pants and boots in order to attend the job walk following the pre-bid meeting.
Login at https://piee.eb.mil and search for 'W912HY24R0012' to obtain more details.*
DHS CENTER STAIR FINISHES, SOUND ATTENUATION, INTERVIEW ROOM SPEAKER AND WALL AND DOORS IN BUILDING 25 AT THE DENVER FEDERAL CENTER IN LAKEWOOD COLORADO Solicitation ID/Procurement Identifier: EQ8PCS-23-0074 Ultimate Completion Date: Sun Jun 23 17:00:00 GMT 2024
Stair 1121W door swing with the revised direction of exit access. Stair 1121W partition demolition to remove an existing reduction in egress width violation. Shaft 715; replacement / installation of a rated door and associated hardware. Perform existing MRI electrical cut-over to Vault 6 Substation Provide electrical cutovers and relocate equipment for existing Hybrid OR. All construction work to be done according to approved Phasing Plan.
All handrails, including stairways, shall be cleaned if needed. Monthly Services: 1. Dust above hand height, including but not limited to vents, fixtures, cabinets, lockers, vending machines, door frames, shelves, pictures, etc. 2. Remove finger prints and marks from light switches, door frames and area around door handles. 3. Vacuum all upholstered furniture. 4. All walls, doors, frames and baseboards shall be cleaned as needed. 5.
PAINT ALL HANDRAILS, STEEL FOR STAIRS AND EXISTING BLUE COLUMNS ACCENT 1. 9 PAINT ACCENT WALL WHERE INDICATED ON PLAN, SEE PHOTOGRAPH 4. OTHER 3 WALLS: PAINT TOP BLOCK ACCENT 4; PAINT NEXT TWO BLOCKS ACCENT 1.