Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid Notification
Pre-Bid Notification
Active
Search For: Tunnel
Showing opportunity 1 - 10 of 1,194
  • CSU Line Tunnel Insulation

    Type : Bid Notification
    Due : 21 Jun, 2019 (in 3 days)
    Posted : 2 days ago
    Started : 13 Jun, 2019 (4 days ago)

    CSU Line Tunnel Insulation Location Colorado Publication Date 06/13/2019 Closing Date 06/21/2019 02:00 PM MDT

    From: Rocky Mountain (Co-op)
  • Wet Standpipe Fire in the L Line Tunnel

    Type : Bid Notification
    Due : 25 Jun, 2019 (in 7 days)
    Posted : 24 days ago
    Started : 11 Jun, 2019 (6 days ago)

    CONTRACT NUMBER: 54RR-210A TITLE: Wet Standpipe Fire in the L Line Tunnel PRE-PROPOSAL MEETING/SITE INSPECTION: June 12, 2019 PROPOSAL DUE DATE: June 25, 2019 ESTIMATED COST: $550,000 - $600,000 SUMMARY OF SCOPE: The scope of the L Line Wet Standpipe project. It is to furnish a new fire protection system in the L Line Tunnel that is Consistent with other wet standpipe in tunnels throughout the District.  Installation of a new public hydrant at the end of Lynn Court, including valves, installation of buried pipe that enters the BART ROW, with new double detector check, post indicator valve, fire department connection , flow sensor and transition to above-grade, wall-mount piping, support and bracing of wet standpipe along sound wall, retaini...

    From: Bay Area Rapid Transit District (Transportation)
  • OGS Rehab Tunnel and Connection Pts 44981

    Type : Bid Notification
    Due : 19 Jun, 2019 (in 1 day)
    Posted : 10 days ago
    Started : 07 Jun, 2019 (10 days ago)

    Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:06/07/2019 Due Date:06/19/2019 Ad Type:Contractor Ads

    From: New York State Contract Reporter (City)
  • CDOT Eisenhower Tunnel Office/Control Room HVAC Upgrade

    Type : Bid Notification
    Due : 27 Jun, 2019 (in 9 days)
    Posted : 17 days ago
    Started : 30 May, 2019 (18 days ago)

    CDOT Eisenhower Tunnel Office/Control Room HVAC Upgrade Location Colorado Publication Date 05/30/2019 Closing Date 06/27/2019 02:00 PM MDT

    From: Rocky Mountain (Co-op)
  • MA-BANKHEAD & WALLACE TUNNEL MAINTENANCE/CLEANING

    Type : Bid Notification
    Due : 25 Jun, 2019 (in 8 days)
    Posted : 23 days ago
    Started : 24 May, 2019 (24 days ago)

    MA-BANKHEAD & WALLACE TUNNEL MAINTENANCE/CLEANING RFB -  012 -  19000000903 Summary     Transportation Kerri Hines General Request for Bids(RFB) Published On :   5/24/19 Amended On :     Closing On :    6/25/19 5:00 PM CDT Time Left:    26 Days, 14:02:32 Intent Posted On:   Open

    From: Alabama (State)
  • (
  • (
  • (
  • (
  • (
sentinel