Search results for: Structural Steel

Refine your Search
Apply several filters to get precise search results

People also searched for

breaker overhaul
Showing opportunity 41 - 50 of 178
  • Goleta Train Depot Project

    Type : Bid Notification

    Due : 16 May, 2024 (in 12 days)
    Posted : 25 days ago
    Started : 08 Apr, 2024 (26 days ago)

    Construction 236220 - Commercial and Institutional Building Construction 237110 - Water and Sewer Line and Related Structures Construction 237130 - Power and Communication Line and Related Structures Construction 237310 - Highway, Street, and Bridge Construction 237990 - Other Heavy and Civil Engineering Construction 238110 - Poured Concrete Foundation and Structure Contractors 238120 - Structural Steel and Precast Concrete Contractors 238130 - Framing

    From: Goleta (City)

  • Corrugated steel pipe, structural concrete headwall, remove culvert.

    Type : Bid Notification

    Due : 21 May, 2024 (in 17 days)
    Posted : 11 days ago
    Started : 07 Apr, 2024 (27 days ago)

    01-0L7404 Corrugated steel pipe, structural concrete headwall, remove culvert. Department of Transportation 05/21/2024 2:00PM PDT Posted

    From: California (State)

  • RCTC - EXPRESS LANES ROAD PAVEMENT ANALYSIS SERVICES

    Type : Bid Notification

    Due : 28 May, 2024 (in 24 days)
    Posted : 1 day ago
    Started : 29 Apr, 2024 (4 days ago)

    Contractors 238120 - Structural Steel and Precast Concrete Contractors 541611 - Administrative Management and General Management Consulting Services 541618 - Other Management Consulting Services 541620 - Environmental Consulting Services 541990 - All Other Professional, Scientific, and Technical Services 813920 - Professional Organizations License Requirements Department Procurement Address 4080 Lemon Street 3rd Floor Riverside, California 92502

    From: Riverside County Transportation Commission (Transportation)

  • Contractor Prequalification Application

    Type : Bid Notification

    Due : 30 Jun, 2024 (in 1 month)
    Posted : 11 months ago
    Started : 10 May, 2023 (11 months ago)

    C-51 Structural Steel C-53 Swimming Pool C-54 Tile D-56 Trenching D-59 Hydroseed Spraying D-62 Air and Water Balancing D-63 Construction Cleanup D-64 Non-specialized D-65 Weatherization and Energy Conservation ASB Asbestos Certification HAZ Hazardous Substance Removal CertificationTimelineRelease Project Date:May 10, 2023Proposal Submission Deadline:June 30, 2024, 12:00am

    From: Palm Desert (City)

  • Bottom Creek Brewery & Restaurant-Bid Pack #2-All Building Trades-North Branch, MI

    Type : Bid Notification

    Due : 14 May, 2024 (in 9 days)
    Posted : 15 days ago
    Started : 15 Apr, 2024 (18 days ago)

    Bid Package #2 includes the associated underground scopes of work within the building pad; and all other related scopes of work required to construct the (3) structures on site.Buildings only Construction of a New Resort Area, Including a Restaurant, Brewery, and PavilionDivision 4 Masonry: Exterior Stone Cladding and MortarDivision 5 Metals: Structural Steel, Steel Joists, Decking, Guardrails, Metal Pan Stairs, Railings, Decorative Metals Division

    From: Gleeson Constructors (Co-op)

  • Barry Rose WRF Expansion and Longwood WRF decommissioning

    Type : Bid Notification

    Due : 26 Jul, 2024 (in 2 months)
    Posted : 22 days ago
    Started : 27 Mar, 2024 (1 month ago)

    Anticipated Packages include: Supply of concrete formwork, accessories and reinforcement Ready-mix concrete material supply Concrete pumping Concrete water treatment structure placement Rebar installation Paving and concrete flatwork Masonry Structural Steel fabrication and installation Pre-engineered Metal building fabrication and installation Miscellaneous metals fabrication and installation Waterproofing and joint sealants Metal panel and louver

    From: McCarthy (Other)

  • CHILD DEVELOPMENT CENTER (CDC), Lackland Air Force Base, Texas

    Type : Pre-Bid Notification

    Due : 15 May, 2024 (in 11 days)
    Posted : 2 months ago
    Started : 02 Apr, 2024 (1 month ago)

    The new facility will include child development areas for infants, pre-toddlers, toddlers, preschoolers, administrative space, lobby areas, public restrooms, storage rooms, kitchen area and playground areas with equipment provided from other appropriations. The construction will consist of concrete foundation, concrete floor slabs, structural steel frame, masonry walls and standing seam metal roof.

    From: Federal Government (Federal)