Type : Bid Notification
The contractor will also provide all paint, caulking, all equipment and cleaning supplies associated with painting. a. Patch surfaces, remove any nails, patch and sand areas to be painted as needed to include all door frames, and all doors unless directed to do otherwise. b. Clean all surfaces to be painted. c. Apply painter’s caulking in a continuous bead as needed. d. Apply at least two coats of paint to all surfaces that are painted. e.