Search results for: Bonding

Refine your Search
Apply several filters to get precise search results
Showing opportunity 21 - 30 of 672
  • LC4139 Solar Panel System — #2004185

    Type : Bid Notification

    Due : 02 Apr, 2024 (in 4 days)
    Posted : 2 days ago
    Started : 26 Mar, 2024 (2 days ago)

    Base & 10 Cover Kit Qty. of (1) ENP COMMS-KIT-01 IQ System Kit Qty. of (1) ENP CELLMODEM-M1 Mobile Connect 5YR LTE M1 CELLMOD Qty. of (9) IRIDG XR-10-168M 168 Rail, XR10, Mill Qty. of (6) IRIDG XR-10-BOSS-01-M1 New XR-10 Splice-THE Springsteen Qty. of (40) IRIDG UFO-CL-01-B1 Universal Clamp, Black Qty. of (14) IRIDG UFO-STP-30MM-B1 Stopper Sleeve, 30MM, BLK Qty. of (1) IRIDG XR-LUG-03-A-1 Grounding Lug Qty. of (18) IRIDG BHW-MI-01-A1 Micro Inverter Bonding

    From: Webb (County)

  • LC4139 Solar Panel System — #2004185

    Type : Bid Notification

    Due : 03 Apr, 2024 (in 4 days)
    Posted : 2 days ago
    Started : 26 Mar, 2024 (2 days ago)

    Base & 10 Cover Kit Qty. of (1) ENP COMMS-KIT-01 IQ System Kit Qty. of (1) ENP CELLMODEM-M1 Mobile Connect 5YR LTE M1 CELLMOD Qty. of (9) IRIDG XR-10-168M 168 Rail, XR10, Mill Qty. of (6) IRIDG XR-10-BOSS-01-M1 New XR-10 Splice-THE Springsteen Qty. of (40) IRIDG UFO-CL-01-B1 Universal Clamp, Black Qty. of (14) IRIDG UFO-STP-30MM-B1 Stopper Sleeve, 30MM, BLK Qty. of (1) IRIDG XR-LUG-03-A-1 Grounding Lug Qty. of (18) IRIDG BHW-MI-01-A1 Micro Inverter Bonding

    From: Bethlehem (City)

  • Lawton Modular Building Site

    Lawton Modular Building Site

    Type : Bid Notification

    Due : 29 Mar, 2024 (Today)
    Posted : 16 days ago
    Started : 11 Mar, 2024 (17 days ago)

    Bond Capacity: Information on the firm's bonding capability - specifically identify single and aggregate bonding capacities. 6. Experience Submission Requirements: Submit at least two (2) but no more than five (5) projects completed by your firm within the last six (6) years that are similar to the work that will be required under this project. Firms shall include the following information for each project: a.

    From: Federal Government (Federal)

  • USACE SPK DBB Construction - Holding Pad and Berm Repairs - Military Ocean Terminal Concord (MOTCO), CA

    Type : Bid Notification

    Due : 03 Apr, 2024 (in 4 days)
    Posted : 9 days ago
    Started : 19 Mar, 2024 (9 days ago)

    If no set aside is made, the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor will be required to self-perform the percent of work identified in the solicitation under FAR 52.236-1, Performance of Work by the Contractor.Contractors with the skill, capabilities, workload capacity, and ability to obtain bonding to complete the project described above (either through self-performance

    From: Federal Government (Federal)

  • Design and Fabrication of the Low and High Compression System for High Temperature Test Facility

    Type : Bid Notification

    Due : 15 Apr, 2024 (in 17 days)
    Posted : 6 days ago
    Started : 21 Mar, 2024 (7 days ago)

    Included must be sufficient written information confirming the responder’s qualifications that addresses each of the following criteria: • Experience with handling, processing, and storing compressed hydrogen • Experience with the design, fabrication integration and installation of hydrogen compression and post processing systems • Knowledge and experience in meeting applicable safety, regulatory and code compliance • Financial and bonding capacity

    From: Federal Government (Federal)

  • Lowe San Joaquin Reach TS30L

    Lowe San Joaquin Reach TS30L

    Type : Bid Notification

    Due : 29 Mar, 2024 (Today)
    Posted : 14 days ago
    Started : 14 Mar, 2024 (14 days ago)

    Contractors with the skill, capabilities, workload capacity, and ability to obtain bonding to complete the project described above (either through self-performance and/or Subcontractor management) are invited to provide capability statements to the point of contact listed below. Other than small businesses are also encouraged to submit Capability Statements.

    From: Federal Government (Federal)

  • Stage - 2 Pedestrian Crossing, Rouge Urban National Park

    Type : Bid Notification

    Due : 04 Apr, 2024 (in 5 days)
    Posted : 13 days ago
    Started : 15 Mar, 2024 (14 days ago)

    To assist with bonding and insurance requirements, this project is estimated at a value between $100, 001 > $250,000, Taxes extra. TWO STAGE SELECTION PROCESS This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers.

    From: Canada (Federal)