Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid Notification
Pre-Bid Notification
Active
Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid Notification
Pre-Bid Notification
Active
Search For: Bonding
Showing opportunity 1 - 10 of 765
  • KC135 Beddown ADD Flight Simulator Training, MacDill AFB, FL

    Type : Bid Notification
    Due : 24 Oct, 2019 (in 1 day)
    Posted : 14 days ago
    Started : 07 Oct, 2019 (15 days ago)

    Bonding capability (construction bonding level per single contract/task order and aggregate construction bonding level, both expressed in dollars along with current available bonding capacity. 4. Provide CPARS, PPQs, or other means to describe capability to perform projects similar to that listed above. The projects should be of similar scope and magnitude and should have been completed within the last eight years.

    From: Federal Government (Federal)
  • AFGHAN NATIONAL DETENTION FACILITY AND PRISON AT PARWAN (ANDFP-P)

    Type : Bid Notification
    Due : 01 Nov, 2019 (in 9 days)
    Posted : 6 days ago
    Started : 17 Oct, 2019 (5 days ago)

    BONDING CAPACITY: Offeror's bonding capability (construction bonding level per contract and aggregate construction bonding level), both expressed in dollars. 9. SUBMISSIONS: The Government is seeking to identify qualified sources under the anticipated North American Industry Classification System (NAICS) Code 236220 - Commercial and Institutional Building Construction, either singly or as part of a Joint-Venture. Size Standard $36.5M. 10.

    From: Federal Government (Federal)
  • Hebert Hoover Dike, Structures S-269 and S-270 Ramp Paving and Electrical Service, Palm Beach County, Florida

    Type : Bid Notification
    Due : 29 Oct, 2019 (in 6 days)
    Posted : 3 days ago
    Started : 18 Oct, 2019 (4 days ago)

    If significant subcontracting or teaming is anticipated in order to deliver technical capability, firms should address the structure of such arrangements to include Joint Venture information if applicable - existing and potential. 6.

    From: Federal Government (Federal)
  • 24-30 Inch Cutterhead Dredge

    Type : Bid Notification
    Due : 29 Oct, 2019 (in 6 days)
    Posted : 20 days ago
    Started : 02 Oct, 2019 (20 days ago)

    The solicitation(s) will be for the award of Indefinite Delivery, Indefinite Quantity contract(s) with task orders issued for various dredging locations with the maximum contract value not to exceed $24 million each. The proposed construction duration will be 14 months after the Notice of award of the contract.

    From: Federal Government (Federal)
  • Repair West Dam Top Road Wallisville

    Type : Bid Notification
    Due : 01 Nov, 2019 (in 9 days)
    Posted : 3 days ago
    Started : 18 Oct, 2019 (4 days ago)

    Bonding Requirements: The Contractor will be required to provide the Performance and Payment Bonds within 5 calendar day after award. The contractor shall begin work within 10 calendar days after acknowledgement of the Notice to Proceed. 8. Questions concerning this Sources Sought should be emailed to the Contract Specialist, Ms Ronalda Burton at ronalda.burton@usace.army.mil 9.

    From: Federal Government (Federal)
  • Z--Upgrade Elevators (Construction) Project# 607-19-103

    Type : Bid Notification
    Due : 23 Oct, 2019 (Tomorrow)
    Posted : 6 days ago
    Started : 16 Oct, 2019 (6 days ago)

    Letter from the surety regarding the maximum bonding capability for a single contract action as well as the total aggregate bonding capacity. Total submittal shall be no longer than (3) three pages in one .pdf file or word document. Responses are required to be sent via email to Stacy.Hoover2@va.gov, no later than 1:00pm Local Time, October 23, 2019. THIS IS NOT A REQUEST FOR PROPOSALS.

    From: Federal Government (Federal)
  • EAST CAMPUS BUILDING 4 (ECB4), FORT GEORGE G. MEADE, MARYLAND

    Type : Bid Notification
    Due : 30 Oct, 2019 (in 7 days)
    Posted : 18 days ago
    Started : 04 Oct, 2019 (18 days ago)

    Further, please include your response to the following items (in the exact order): (1) Organization name, address, email address, website address, telephone number, and business size (small or large) and type of ownership for the organization; include DUNS number and CAGE code. (2) Firm's interest in providing a proposal on the pending solicitation once issued. (3) Experience: Evidence of capabilities to perform work comparable to that required for

    From: Federal Government (Federal)
  • Technical Advisor on Life and Fire Safety

    Type : Bid Notification
    Due : 25 Oct, 2019 (in 2 days)
    Posted : 22 days ago
    Started : 18 Oct, 2019 (4 days ago)

    The LTA shall also perform any other activities or tasks incidental to those described below that are required in order for the LTA to provide the Deliverables. Work shall also include kick-off calls with OPIC and the Borrower and other calls and email updates as necessary.

    From: Federal Government (Federal)
  • AFMES Warehouse Addition/Alteration Dover AFB

    Type : Bid Notification
    Due : 24 Oct, 2019 (in 1 day)
    Posted : 12 days ago
    Started : 10 Oct, 2019 (12 days ago)

    In order to protect the procurement integrity of any future procurement, if any, that may arise from this announcement, information regarding the technical point of contact will not be given and no appointments for presentations will be made. The U.S. Army Corps of Engineers, Philadelphia District, is conducting market research to identify potential certified Small Business sources in any of the following categories: U.S.

    From: Federal Government (Federal)
  • PROJECT #2508.0 Ag North HVAC General Contractor LEXINGTON, KENTUCKY,

    Type : Bid Notification
    Due : 25 Oct, 2019 (in 2 days)
    Posted : 24 days ago
    Started : 06 Oct, 2019 (15 days ago)

    SCHEDULE OF PROJECT The time for Substantial Completion as further defined in Article 1 of the General Conditions shall be 365 consecutive calendar days from the date of commencement as specified in the work order letter, and final completion shall be thirty (30) days thereafter. 6. BONDING All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid.

    From: University of Kentucky (Higher Education)