Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid Notification
Pre-Bid Notification
Active
Refine your Search
Apply several filters to get precise search results
Filters Applied Clear
Bid Notification
Pre-Bid Notification
Active
Search For: Additives
Showing opportunity 1 - 10 of 83
  • Cart Mounted <b>Additive</b> Injection System

    Cart Mounted Additive Injection System

    Type : Bid Notification
    Due : 18 Sep, 2019 (Today)
    Posted : 13 days ago
    Started : 04 Sep, 2019 (13 days ago)

    The NAICS code is 424720 and the small business size standard is 500 EMP V) COMMERCIAL ITEM DESCRIPTION: CLIN 0001-Cart Mounted Additive Injection System Hammonds Additive Injection System: Model HC800-2L-1P7-1P7 or equal Cart shall include the following: Hand cart moveable by one person, product flow range: 75-700 GPM, product connections: Inlet: Single Point inlet adapter, Outlet: single point nozzle, 2-1/2" x 10' aviation fueling hose.

    From: Federal Government (Federal)
  • 89--FTC Oklahoma City Q1 FY20 Subsistence - Spices

    Type : Bid Notification
    Due : 20 Sep, 2019 (in 1 day)
    Posted : 7 days ago
    Started : 09 Sep, 2019 (9 days ago)

    The associated North American Industrial Classification System (NAICS) code for this procurement is 311999 with a small business size standard of 500.00 employees. This requirement is a [ Small Business ] set-aside and only qualified offerors may submit bids.

    From: Federal Government (Federal)
  • Stormwater Rebuild 2019

    Type : Bid Notification
    Due : 24 Sep, 2019 (in 6 days)
    Posted : 23 days ago
    Started : 25 Aug, 2019 (23 days ago)

    Additive alternates include an additional 180LF of pipe, 4 additional inlets and associated restoration. E-Bidding No

    From: Ormond Beach (City)
  • Pilot Plant Scale, Vacuum Induction, Gas Atomization System for Production of <b>Non</b>-Reactive Metallic Powders

    Pilot Plant Scale, Vacuum Induction, Gas Atomization System for Production of Non-Reactive Metallic Powders

    Type : Pre-Bid Notification
    Due : 18 Sep, 2019 (Today)
    Posted : 29 days ago
    Started : 19 Aug, 2019 (29 days ago)

    Added: Aug 19, 2019 12:19 pm NASA Glenn Research Center (GRC) is interested in gathering data to identify a price estimate, anticipated delivery schedule, and general company capabilities for possible procurement of a turn-key, pilot plant scale, vacuum induction, close-coupled die gas atomization system for production of non-reactive metal alloy powders, hereafter referred to as the "atomization system."

    From: Federal Government (Federal)
  • Johnstons Road Sidewalk Improvements (Rebid)

    Type : Bid Notification
    Due : 09 Oct, 2019 (in 21 days)
    Posted : 5 days ago
    Started : 11 Sep, 2019 (6 days ago)

    The Work under this project consists of installing sidewalk along Johnstons Road with an additive alternate to install additional sidewalk along Devonshire Road.  This Project will be utilizing Community Development Block Grant (“CDBG”) funds.  Contractor must be in compliance with all requirements under the Grant.    

    From: Norfolk (City)
  • Coffee and Equipment Nov 2019 - June 2020

    Type : Bid Notification
    Due : 30 Sep, 2019 (in 12 days)
    Posted : 10 days ago
    Started : 09 Sep, 2019 (8 days ago)

    06/19 Types: IFB Advertisement Type: ServiceMaterialsService & MaterialsPW ConstructionAgency ConstructionReal Estate Solicitation/Project#: 6100048926 Solicitation/Project Title: Coffee and Equipment Nov 2019 - June 2020 Description: Coffee concentrate, decaffeinated, 97% caffeine free see specifications and special terms and conditions below).  100% coffee roasted, blended and brewed from coffee beans, with no additives

    From: Pennsylvania (State)
  • SASPO RFI - Hill Industry Day 18Jul2019

    Type : Bid Notification
    Due : 30 Sep, 2019 (in 11 days)
    Posted : 1 month ago
    Started : 31 Jul, 2019 (1 month ago)

    Additive ManufacturingD. Alternate Sourcing***If you would like to participate in the technical discussions referenced in the attached quad charts please provide the following information to 429SCMS.SASPO.Workflow@us.af.mil ***• Company, address, name(s), email(s), phone• Your questions for engineering**Once you have RSVP'd we will send you a calendar invite with the call in number.

    From: Federal Government (Federal)
  • J--Emergency Generator Maintenance / Repair Baltimore, MD and Lock Raven VAMC

    J--Emergency Generator Maintenance / Repair Baltimore, MD and Lock Raven VAMC

    Type : Pre-Bid Notification
    Due : 18 Sep, 2019 (Today)
    Posted : 13 days ago
    Started : 04 Sep, 2019 (13 days ago)

    Once per year: Oil changed and oil filter(s) changed on each generator. Oil analyzed before oil change. Diesel Fuel analyzed in each day tank. 4-hour load bank test on each emergency generator (7-each). The load bank testing must be coordinated with and approved by VA COR. Twice per year: Fuel tanks and lines to be inspected for the purpose of determining if excessive sludge or rust is collecting.

    From: Federal Government (Federal)
  • 89--National Menu Subsistence - Q1 FY20

    Type : Bid Notification
    Due : 19 Sep, 2019 (Tomorrow)
    Posted : 6 days ago
    Started : 11 Sep, 2019 (6 days ago)

    Pure - no additives, extenders, foreign matter, or flow agents. 1/2 oz to 50 lb sealed plastic containers or boxes. Note package size on bid., 300, LB; LI 052: Spices, Garlic, Powder. From dehydrated garlic bulb ground to a fine powder after the milling process. 100% air dried garlic. Appearance and Flavor Cream Brown Fine Powder with the characteristic odor and flavor of garlic. No off notes.

    From: Federal Government (Federal)
  • 89--FMC Carswell FY20 Q1 Subsistence

    Type : Bid Notification
    Due : 24 Sep, 2019 (in 6 days)
    Posted : 7 days ago
    Started : 10 Sep, 2019 (7 days ago)

    Soy Protein Products (SPP) covered by this specification are food products produced by the reduction or removal from soybeans of certain of the major non-protein constituents (water, oil, carbohydrates) in a manner to achieve a protein content of:– in the case of soy protein flour (SPF) 50% or more and less than 65%;– in the case of soy protein concentrate (SPC) 65% or more and less than 90%;– in the case of soy protein isolate (SPI) 90% or more.The

    From: Federal Government (Federal)