Type : Bid Notification
Maintenance And Repair Services) NIGP 910 Building Maintenance, Installation And Repair Services NIGP 912 Construction Services, General (Incl. Maintenance And Repair Services) NIGP 913 Construction Services, Heavy (Incl.
People also searched for
Maintenance And Repair Services) NIGP 910 Building Maintenance, Installation And Repair Services NIGP 912 Construction Services, General (Incl. Maintenance And Repair Services) NIGP 913 Construction Services, Heavy (Incl.
In accordance with the Town’s Procurement Code, the Town will accept sealed Proposals for the Services specified in the Scope of Work.BackgroundThe Golden Eagle Impoundment project generally consists of pedestrian bridge construction, drainage channel improvements, Sediment drop basin construction, floodwall construction, irrigation relocation, landscaping and other miscellaneous work as required.
Project: Construction of Elevator Shaft Ref. #: 25-024 Type: RFT Status: Open Open Date: Apr 10th 2024, 10:00 AM EDT Questions Due Date: Apr 26th 2024, 11:30 PM EDT Close Date: May 7th 2024, 2:00 PM EDT Days Left: 7 Project Description:Cambrian College is seeking the expertise of a qualified and competent Contractor capable of supplying all labour, equipment, and materials necessary for the Construction of an Elevator Shaft for an owner-supplied LULA
Items of work include consists of clearing, grubbing, removing old structure, excavation common, base aggregate dense, heavy riprap, asphaltic surface, permanent signing, structure B-49-199 & B-49-200, finishing items, erosion control items, traffic control, and any incidental items necessary to complete the work.
Items of work include consists of clearing, grubbing, removing old structure, excavation common, base aggregate dense, heavy riprap, asphaltic surface, permanent signing, structure B-49-199 & B-49-200, finishing items, erosion control items, traffic control, and any incidental items necessary to complete the work.
Services include but are not limited to: Multiple Construction Projects (3 Projects).Please review the attached (3) Statements of Work (SOW) and any applicable maps/drawings for the eachrequirement.Site Visit dates will be pre-scheduled and posted in the solicitation, if/when it is posted.The required response date will be posted on via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.This Solicitation may result in ONE
Pipeline Construction Inspection Services SaskEnergy Incorporated TX6961 Apr 30, 2024 12:00 PM CST May 03, 2024 05:00 PM CST Open